USA-FORM, INC
  • Home
  • Our Formwork
    • Custom Bridge Forms
    • Custom WALL FORMS
    • Tunnel and Shaft Forms
  • Engineering
  • CURRENT PROJECTS
    • GOLDLINE PHASE 2B
    • PETERSON & RIDGE METRA STATION
    • I-294 / I-490 TOLLWAY S1-S2
    • WIPP PROJECT
    • I-55 & I-294 TOLLWAY
    • RED / PURPLE LINE
    • I-15 VIRGIN RIVER BRIDGE
    • I-490 WESTERN ACCESS
    • I-275 HOWARD FRANKLAND
    • WMATA 4
    • ROUTE 13 CONNECTOR
    • Cleveland Cliffs
  • About USA-Form
USA-FORM, INC. SUPPLIED THE FORMWORK FOR THE PIER FOOTINGS, STEMS, & CAPS FOR KIEWIT ON THE I-15 VIRGIN RIVER BRIDGE PROJECT. THE STEM HEIGHTS VARIED FROM 74'-3" TO 75'-8" AND WERE PLANNED AND DESIGNED TO BE POURED IN TWO LIFTS.
USA-FORM SUPPLIED THE 7'-0" TALL FOOTING FORMWORK, A LOWER SET OF STEM FORMWORK THAT WAS 53'-0" IN HEIGHT, A SET OF UPPER STEM FORMWORK THAT WAS 23'-0" IN HEIGHT WITH WORK / SAFETY DECK AROUND THE PERIMITER; AS WELL AS, THE PIER CAP WORK DECK / SOFFIT FORMWORK, SIDE & BULKHEAD FORMWORK. 

USA-FORM ALSO SUPPLIED THE TAPERED SLED BLOCK OUTS FOR THE HAMMER HEAD PIER CAPS.
THIS ALLOWED KIEWIT TO SET AND POUR A LOWER, UPPER, AND CAP ALL AT ONCE. 
Powered by Create your own unique website with customizable templates.
  • Home
  • Our Formwork
    • Custom Bridge Forms
    • Custom WALL FORMS
    • Tunnel and Shaft Forms
  • Engineering
  • CURRENT PROJECTS
    • GOLDLINE PHASE 2B
    • PETERSON & RIDGE METRA STATION
    • I-294 / I-490 TOLLWAY S1-S2
    • WIPP PROJECT
    • I-55 & I-294 TOLLWAY
    • RED / PURPLE LINE
    • I-15 VIRGIN RIVER BRIDGE
    • I-490 WESTERN ACCESS
    • I-275 HOWARD FRANKLAND
    • WMATA 4
    • ROUTE 13 CONNECTOR
    • Cleveland Cliffs
  • About USA-Form