USA-FORM, INC
  • Home
  • Our Formwork
    • Custom Bridge Forms
    • Custom WALL FORMS
    • Tunnel and Shaft Forms
  • Engineering
  • CURRENT PROJECTS
    • GOLDLINE PHASE 2B
    • PETERSON & RIDGE METRA STATION
    • I-294 / I-490 TOLLWAY S1-S2
    • WIPP PROJECT
    • I-55 & I-294 TOLLWAY
    • RED / PURPLE LINE
    • I-15 VIRGIN RIVER BRIDGE
    • I-490 WESTERN ACCESS
    • I-275 HOWARD FRANKLAND
    • WMATA 4
    • ROUTE 13 CONNECTOR
    • Cleveland Cliffs
  • About USA-Form
USA-FORM, INC. SUPPLIED WALL FORMWORK FOR SUPERIOR CONSTRUCTION ON THE CLEVELAND CLIFFS PROJECT. SUPERIOR WAS ABLE TO POUR THE ENTIRE "SLAG WALL" IN ONE SHOT, APROXIMENTLY 217 YARDS OF CONCRETE. THE WALL WAS AT ITS TALLEST 18'-4" WITH A BATTERED FACE. SUPERIOR NOW IS REUSING THE FORMWORK TO DO ONE-SIDED WALL POURS AGAINST SHEET PILE FOR THE GRANULATOR PITS & WATER BASIN.
Powered by Create your own unique website with customizable templates.
  • Home
  • Our Formwork
    • Custom Bridge Forms
    • Custom WALL FORMS
    • Tunnel and Shaft Forms
  • Engineering
  • CURRENT PROJECTS
    • GOLDLINE PHASE 2B
    • PETERSON & RIDGE METRA STATION
    • I-294 / I-490 TOLLWAY S1-S2
    • WIPP PROJECT
    • I-55 & I-294 TOLLWAY
    • RED / PURPLE LINE
    • I-15 VIRGIN RIVER BRIDGE
    • I-490 WESTERN ACCESS
    • I-275 HOWARD FRANKLAND
    • WMATA 4
    • ROUTE 13 CONNECTOR
    • Cleveland Cliffs
  • About USA-Form